Cleburne High School Career Technology Entrance - Cleburne ISD (Subbid)

07/13/2017 08:10:00 am | Viewed: 86

Cleburne High School Career Technology Entrance - Cleburne ISD (Subbid)
Cleburne, TX (Johnson Co.) –

Work will consist of extensive renovations to approximately 270,000 sf of the existing Cleburne High School, as well as nearly 300,000 sf of additions to the school.

Site work consists of new parking (demo of existing parking at certain locations), new artificial turf Baseball and Softball Fields (demolish existing fields), and providing new turf at the sub-varsity Football Field. Existing metal buildings are to be removed completely and a new Concessions building and Baseball/Softball Locker Room building is to be built. New site lighting, scoreboards, sidewalks, and fencing are to be located throughout the site. Landscape plantings, irrigation system, site signage, and seating/landscape areas are to be provided as well.

The renovations include, new MEP, fire sprinkler, and technology infrastructure throughout (except for the existing Auditorium space, which will remain untouched). New walls of metal stud/gyp., CMU, and interior storefront window system are to be located throughout, with new ceilings of suspended acoustical ceiling tile, gyp., and wood at various locations.  Career and Technology educational programs will be located in much of the existing buildings with unique features associated with each program built into each area (including a culinary arts kitchen). A second floor to the Band Hall area is to be provided as well as a new Black Box Theater in the open central area of the school. Paint, graphics, and signage will be located throughout the renovation areas.

New entrances are to be built onto the existing High School for the Performing Arts Center (PAC), the Career and Technology Entrance (CTE), and the alternative school (TEAM). These steel framed, masonry veneer entrances will be similar to the new additions.

The new construction consists of a two-story academic wing with a central high volume Lobby, two-story Library and Cafeteria areas, a single-story science wing, and a new athletics additions consisting of a new Competition Gym, accessory Gym, locker rooms, and a training room suite. The new construction is slab-on-grade foundation system with a steel structure (with metal stud/gyp) walls in academic areas and steel and CMU structure in the Kitchen and athletic areas of the building. New MEP, technology, and fire sprinkler system to be installed throughout, with portions of the building compartmentalized to stay within the Type IIB construction method.



This project was last updated on 7/12/2017 11:41:01 AM. 

CONSTRUCTION CATEGORIES BIDDING THIS PROJECT:
Architect - 1 
Civil Engineer - 1 
Construction Manager - 1 
Engineer - 2 
Landscape Architect - 1 
MEP Engineer - 1 
Owner / Purchaser / Developer - 1 
Owners Representative - 1 
Structural Engineer - 1 

PROJECT DOCUMENTS ON THIS PROJECT:
BLUEPRINTS 
Acoustical - 68 sheets 
Architectural - 312 sheets 
Civil - 31 sheets 
Communications - 35 sheets 
Electrical - 64 sheets 
Fire Protection - 2 sheets 
Food Service - 32 sheets 
General - 9 sheets 
Landscape - 28 sheets 
Lighting - 36 sheets 
Mechanical - 59 sheets 
Phasing and Site Logistics Plan for Bidders - 1 sheets 
Plumbing - 56 sheets 
Structural - 118 sheets 
SPECIFICATIONS 
246 Sections
 
ADDENDA 
12 Reported


NOTE: Members may view project details by inputting the Project ID into “Quick Search” on your DeskPad. 



Project Information
PROJECT ID: 2016-34F5
BID DATE/TIME: 7/13/2017 - 02:00pm CST
ESTIMATED COST: Not Available
SQ FOOTAGE: 570000  
PHASE: Active
STATUS: Addenda Received
PROJECT TYPE: Additions / Renovations / Upgrade
CATEGORY: Education
PUBLIC FUNDING: Yes