Water Treatment Plant Rehabilitation and Miscellaneous Upgrades Project

Odessa, TX (Ector Co.) 

Work includes: multiple rehabilitation efforts and upgrades to various process mechanical, building mechanical, electrical, supervisory control and data acquisition (SCADA), instrumentation and control, civil, structural, and architectural components at the City’s Water Treatment Plant (WTP).

The project also includes SCADA upgrades at other City-owned remote sites including the City of Odessa Bob Derrington Water Reclamation Plant (WRP), remote sites associated with WTP and WRP, Police Department and City Hall.

Major work components include but are not limited to demolition of the existing Plant 1 flocculation and sedimentation basin, the City’s caustic soda building, and other structures. New construction includes a chlorine room extension at the North Chemical Building, a new flocculation and sedimentation train, a new South Chemical Building, a new hydraulic relief line from the filters to Clearwell No. 1, and a new Electrical Building.

Upgrades include rehabilitation of the plant filters, filter building mechanical and structural rehabilitation, replacement of pumps and electrical equipment at various miscellaneous pump stations located within the plant grounds, replacement of mechanical and electrical equipment at the Golder Pump Station, upgrades to the Administration Building control room, break room, restrooms, and ventilation system, and site grading and restoration (including new and repaved chemical delivery roadways).

 


CONSTRUCTION CATEGORIES BIDDING THIS PROJECT:

Bases, Ballasts, & Paving – 1
Bidding General Contractor – 24
Concrete – 1
Demolition – 3
Earthwork – 4
Electrical – 15
Electrical Power Generation Equipment – 1
Engineer – 1
Fences & Gates – 1
Fuel Distribution Utilities – 1
Heating, Ventilation & A/C – 1
High Performance Coatings – 1
Industry Specific Manufacturing Equipment – 1
Instrumentation & Control for Electrical Systems – 5
Instrumentation & Control for HVAC – 1
Instrumentation & Control for Utilties – 1
Integrated Automation – 2
Integrated Automation Control & Monitoring Network – 2
Integrated Automation Network Gateways – 1

PROJECT DOCUMENTS ON THIS PROJECT:

BLUEPRINTS
Architectural – 29 sheets
Civil – 37 sheets
Electrical – 203 sheets
General Volume 1 – 21 sheets
General Volume 2 – 5 sheets
HVAC – 40 sheets
Instrumentation – 301 sheets
Mechanical – 65 sheets
Plumbing – 13 sheets
Structural – 65 sheets
Typical Details – 90 sheets

SPECIFICATIONS
27 Sections

ADDENDA
5 Reported

MEMOS
0 Reported


First Reported on Monday, August 16, 2021 – Last Updated 10/20/2021 9:47:48 AM

Project Information
PROJECT ID: 2021-5F92
BID DATE/TIME: 10/21/2021
02:00pm CST
EST. COST: $83,000,000
SQ FOOTAGE: 0
STATUS: Bidders List / Update
PROJECT TYPE: Additions / Renovations / Upgrade
CATEGORY: Wastewater Treatment
PUBLIC FUNDING: Yes
NON-MEMBER? LEARN MORE MEMBERS CLICK HERE TO ACCESS NOW!
VBX first reported in the Virtual Plan Room on Monday, August 16, 2021.
Members with access to this service may monitor progress by tracking Project ID #2021-5F92.
Construction Preview
By |2021-10-20T12:39:58-05:00October 21st, 2021|Bid Bulletin|

About the Author:

Leave A Comment