Road Construction at Cullen Boulevard (Segment B) from South of Wheeler Avenue to Interstate Highway 45 – Harris County Precinct 1

Harris County, TX (Harris Co.)

Work will consist of road construction at Cullen Boulevard (Segment B) from south of Wheeler Avenue to Interstate Highway 45 for Precinct 1.  The project includes the reconstruction of approximately 4,300 linear feet of concrete curb and gutter roadway section with 12 foot shared use path on both sides. The proposed roadway section consists of 34-foot wide ten (10) inch thick reinforced concrete over eight (8) inch lime stabilized subgrade. The proposed drainage system will consist of the storm sewers, lateral and inlets. The project also includes a new twelve (12) inch waterline, new street and pedestrian lighting, irrigation system and trees. The project also includes six (6) new signals.

 


CONSTRUCTION CATEGORIES BIDDING THIS PROJECT:

Bidding General Contractor – 7
Earthwork – 1
Engineer – 1

PROJECT DOCUMENTS ON THIS PROJECT:

BLUEPRINTS
Cross Sections – 13 sheets
Demolition Plan – 15 sheets
General – 44 sheets
Landscaping Plans – 27 sheets
Roadway and Storm Sewer – 102 sheets
Row Maps – 7 sheets
Signal Plans – 58 sheets
Signing and Pavement Marking Plans – 25 sheets
Soil Boring Logs – 6 sheets
Storm Water Pollution Prevention Plans – 6 sheets
Street Lighting Plans – 14 sheets
Traffic Control Plan – 179 sheets
Water Line Plan – 13 sheets

SPECIFICATIONS
8 Sections

ADDENDA
1 Reported

MEMOS
7 Reported


First Reported on Friday, May 22, 2020 – Last Updated 6/17/2020 3:29:00 PM

Project Information
PROJECT ID: 2020-3F08
BID DATE/TIME: 6/22/2020
02:00pm CST
EST. COST: Not Available
SQ FOOTAGE: 0
STATUS: Addenda Received
PROJECT TYPE: Site Work / Non-Building
CATEGORY: Roadwork / Paving / Bridges / DOT
PUBLIC FUNDING: Yes
NON-MEMBER? LEARN MORE MEMBERS CLICK HERE TO ACCESS NOW!
VBX first reported in the Virtual Plan Room on Friday, May 22, 2020.
Members with access to this service may monitor progress by tracking Project ID #2020-3F08.