Raw Water Infrastructure & Groundwater Treatment Plant – Alliance Regional Water Authority

Rosanky, TX (Bastrop Co.) 

Work to include, but is not limited to the construction of a groundwater treatment plant (GWTP), approximately 22,365 sf. In addition to the groundwater produced from the ARWA wells, the new GWTP will also treat water from the nearby Guadalupe-Blanco River Authority (GBRA) wellfield. The new wellfield and groundwater treatment facility will be developed in phases, with this initial phase, 1B, having a treatment capacity of 19.51-MGD; existing conditions; concrete; masonry; metals; wood, plastics and composites; thermal and moisture protection; openings; finishes; specialties; furnishings; special construction; plumbing; HVAC; electrical; security; earthwork; exterior improvements; utilities; transportation; process interconnections; process gas & liquid handling, purification & storage equipment; pollution and waste control equipment; water and wastewater equipment;

Work also includes:
ARWA Well Pumps and Pump Discharge Piping
Well Field Collection Piping and Roads
Raw Water Storage Tanks
Chemical Feed Systems
Filters in Filter Building
Clearwells
High Service Pump Station and Electrical Building
Administration Building
Solids Handling Facilities

 


CONSTRUCTION CATEGORIES BIDDING THIS PROJECT:

Bidding General Contractor – 11
Civil Engineer – 2
Electrical – 1
Electrical Engineer – 2
Electrical Power Generation Equipment – 1
Engineer – 5

PROJECT DOCUMENTS ON THIS PROJECT:

BLUEPRINTS
Architectural – 16 sheets
Booster Pump Station Security – 8 sheets
Civil – 138 sheets
Electrical – 125 sheets
Fiber Optics – 4 sheets
General – 13 sheets
Heating Ventilation and Air Conditioning – 17 sheets
Instrumentation – 65 sheets
Plumbing – 11 sheets
Process Mechanical – 67 sheets
Structural – 50 sheets

SPECIFICATIONS
26 Sections

ADDENDA
4 Reported

MEMOS
219 Reported


First Reported on Tuesday, March 23, 2021 – Last Updated 4/30/2021 8:02:10 AM

Project Information
PROJECT ID: 2021-20DD
BID DATE/TIME: 5/4/2021
02:00pm CST
EST. COST: $50,000,000 – $60,000,000
SQ FOOTAGE: 22365
STATUS: Addenda Received
PROJECT TYPE: New Construction
CATEGORY: Wastewater Treatment
PUBLIC FUNDING: Yes
NON-MEMBER? LEARN MORE MEMBERS CLICK HERE TO ACCESS NOW!
VBX first reported in the Virtual Plan Room on Tuesday, March 23, 2021.
Members with access to this service may monitor progress by tracking Project ID #2021-20DD.
Construction Preview
By |2021-05-03T11:03:36-05:00May 4th, 2021|Bid Bulletin|

About the Author:

Leave A Comment