web analytics

Panda Express

Montgomery, TX (Montgomery Co.) 

Work will consist of the construction of a new, approximately 2,381 sf Panda Express restaurant with site work. Project will include asphalt; audio / visual; awnings / canopies; brick and stone; cabinets / millwork; carpet; caulking; concrete; curb and gutter; damproofing and waterproofing; door hardware and access controls; driveways / patios / sidewalks; drywall; duct work and vents; electrical; erosion control; ethylene propylene diene monomer (EPDM); demolition; doors; painting; fascia; fences and gates; finish carpentry; fire suppression; flashing; glass and mirrors; glazing and storefronts; grading and fill; HVAC; handrails and railings; hardscapes and retaining walls; joint sealant and expansion control; landscaping; light gauge metal framing; lighting / fixture / fan installation; line striping; partitions; plumbing; retaining walls; rough carpentry and wood framing; signage; site work / excavation; soffit; sprinkler/irrigation systems; stucco and EIFs; temporary barricades; thermoplactic polyolefin (TPO); toilet, bath and laundry specialties; underground utilities; vinyl and VCT flooring; as well as post-construction cleanup and property cleanup.

 


CONSTRUCTION CATEGORIES BIDDING THIS PROJECT:

Architect – 1
Bidding General Contractor – 3
Civil Engineer – 1
Landscape Architect – 1

PROJECT DOCUMENTS ON THIS PROJECT:

BLUEPRINTS
Architectural – 30 sheets
Civil – 14 sheets
Electrical – 13 sheets
General – 5 sheets
Landscape – 1 sheets
Mechanical – 9 sheets
Plumbing – 4 sheets
Structural – 7 sheets

SPECIFICATIONS
2 Sections

ADDENDA
0 Reported

MEMOS
0 Reported


First Reported on Monday, January 25, 2021 – Last Updated 2/18/2021 10:10:37 AM

Project Information
PROJECT ID: 2021-0887
BID DATE/TIME: 2/23/2021
04:00pm CST
EST. COST: $1,300,000
SQ FOOTAGE: 2381
STATUS: Project Update
PROJECT TYPE: New Construction
CATEGORY: Restaurants / Cafe
PUBLIC FUNDING: No
NON-MEMBER? LEARN MORE MEMBERS CLICK HERE TO ACCESS NOW!
VBX first reported in the Virtual Plan Room on Monday, January 25, 2021.
Members with access to this service may monitor progress by tracking Project ID #2021-0887.
Construction Preview
By |2021-02-22T08:58:41-06:00February 23rd, 2021|Bid Bulletin|

About the Author:

Leave A Comment