Null Middle School Additions and Renovations – Sheldon ISD
Houston, TX (Harris Co.) – Work includes a new two-story addition to an existing middle school, approximately 43,270 SF, and select interior renovations of existing rooms. New rooms in the addition include classrooms, science laboratories, administration rooms, and building function rooms (mechanical, electrical, etc.). The work may also include the following;
1. Tree protection, site utilities, cement concrete paving
2. Foundation
3. Structural frame
4. Metal fabrications
5. Face brick veneer
6. Metal wall panels
7. Aluminum, glass and window wall
8. PVC Roofing
9. Interior walls
10. Tile, resilient flooring, sheet carpeting, resinous athletic flooring
11. Suspended plaster, suspended drywall, lay-in panels, sound absorbing units
12. Steel doors and frames, wood doors, Kynar coated storefront, overhead coiling doors
13. Casework
14. Specialties
15. Hydraulic elevators
16. Automatic sprinkler system
17. Plumbing systems
18. HVAC Systems and building automation system
19. Electrical, telecommunications systems, telephone systems, lightning protection and emergency power
20. Fire detection, alarm and emergency call systems
|
|
|