web analytics

New Northeast Operations Center (NEOC) – Package 1 – Early Works – San Antonio Water System (Subbid)

San Antonio, TX (Bexar Co.) 

Scope of work involves the early works package for design, construction and demolition and associated remediation on two (2) separate and distinct worksites, including Site Demolition, Earthwork, SWPPP, Site Utilities, Site Electric, Fencing, Emergency Generator, Truck Scale, Metal Building and Erection.

New North East Operations Center: The NEOC is to be comprised of a minimum of three (3) new freestanding buildings, a new fueling facility with Above Ground Tanks (“AGT’s”), truck scale, material bins, ice and water station structure, electric gates at main and secondary entries with gates and electronic key card access, designated areas and utilities provided for Owner’s OFOI concrete silo, security/IT facilities, storage areas, main access roads and drive lanes with turning radii for all of the aforementioned facilities, and associated sitework, including site parking and drainage.

Existing Northeast Side Service Center: Work includes, demolition, fuel remediation and new site construction as required at the Existing NESC. Demolition of the existing administration building, attached shed/structures, and all contents, as well as exterior concrete material storage bins, and demolition and remediation of two (2) separate fuel islands and existing underground fuel tanks (“UGT’s”) and associated pumps and utilities. All shall be completely demolished and removed. The fuel facility shall be remediated as required by all AHJ’s. Pavements shall be replaced, and installed in the footprint of the Administration Building and fuel islands. A new retaining wall and railing shall also be installed. New construction also includes new guardrails, bollards, railing and any other safety items and associated signage and traffic striping as required, as well as the demolition of the existing two (2) marquee signs and the installation of a new marquee and associated landscaping and lighting, with signage designating the site as the Naco Pump Station.

 


CONSTRUCTION CATEGORIES BIDDING THIS PROJECT:

Architect – 1
Civil Engineer – 1
Design/Build Contractor – 1
Engineer – 1
Landscape Architect – 1

PROJECT DOCUMENTS ON THIS PROJECT:

BLUEPRINTS
Civil – 29 sheets
Fuel – 25 sheets
General – 2 sheets
Irrigation – 7 sheets
Judson Road Improvement Drawings – 13 sheets
Landscape – 7 sheets
MEP – Electrical – 6 sheets
MEP – Plumbing – 8 sheets
Site Architectural – 5 sheets
Structural Drawings – Administration – 11 sheets
Structural Drawings – Fleet – 13 sheets
Structural Drawings – Site – 9 sheets
Structural Drawings – Supply – 11 sheets
Technology – Administration – 7 sheets
Tree Preservation – 4 sheets

SPECIFICATIONS
24 Sections

ADDENDA
0 Reported

MEMOS
7 Reported


First Reported on Monday, February 28, 2022 – Last Updated 5/5/2022 8:41:56 AM

Project Information
PROJECT ID: 2022-17D1
BID DATE/TIME: 5/6/2022
02:00pm CST
EST. COST: Not Available
SQ FOOTAGE: 0
STATUS: Memo Received
PROJECT TYPE: Design / Build
CATEGORY: Office Space
PUBLIC FUNDING: Yes
NON-MEMBER? LEARN MORE MEMBERS CLICK HERE TO ACCESS NOW!
VBX first reported in the Virtual Plan Room on Monday, February 28, 2022.
Members with access to this service may monitor progress by tracking Project ID #2022-17D1.
Construction Preview
By |2022-05-05T12:04:17-05:00May 6th, 2022|Bid Bulletin|

About the Author:

Leave A Comment