web analytics

New High School No. 5 Package 2 – Comal ISD

San Antonio, TX (Bexar Co.)

Package 2 consists of construction of the new 402,000 sf multi-story High School, 25,000 sf athletic & other buildings, 4,500 SF student drop & bus canopies and other necessary site improvements. Pkg. 2 includes the following scopes of work: 03 concrete, 04 masonry, 05 steel, 06 wood, plastics & composites, 07 thermal and moisture protection, 08 openings, 09 finishes, 10 specialties, 11 equipment, 12 furnishings, 13 special construction, 14 conveying systems, 21 fire suppression, 22 plumbing, 23 hvac, 26 electrical, 27 communications, 28 electronic safety and security.

Package 2 does not include division 11 exterior scoreboards, division 13 grandstands & bleachers, division 31 earthwork, division 32 pavement markings, unit pavers, athletic fields & track, tennis courts, fencing, retaining walls and landscape & irrigation, division 33 utilities – these scopes were included in the previous Bid Pkg. 1. Comal ISD New High School #5 is situated on a 70+ acre site and will house approx. 2,500 students.

Bid Areas: There are 3 separate Bid Areas within this project, each bid area should be considered stand alone. Please reference BC’s Proposal Information Book located in the front end of the specs for our Bid Form and more information of these areas.

PreBid Meeting on 2/4/2019 at 10:00 AM – , , – Non-Mandatory Pre-Bid Meeting 02/04/2019 10:00 AM Subcontractors and Suppliers are invited to attend a non-mandatory Pre-Proposal Conference at Bulverde Party House located at 29102 U.S. 281, Bulverde, Texas 78163. Attendance is encouraged but not mandatory. To insure sufficient seating, please email rasher@bartlettcocke.com confirming your attendance..

Notes:

Addendum 2.1 extends the bid date from 2/21 to 2/28.

Please do not contact the Owner, Architect or Engineer for documents.

Submit bids to the Construction Manager.  May be faxed to 210-655-1337 or email bidsat@bartlettcocke.com

Private opening

Addendum 1, 2 and 3 are for Package 1 and are included for reference only.

Every request for an interpretation shall be made in writing and faxed or e-mailed to Bartlett Cocke, attention Russell Asher (210) 655-1337 (fax) or rasher@bartlettcocke.com no later than February 14

Bid Security:
100% Performance and Payment Bonds


CONSTRUCTION CATEGORIES BIDDING THIS PROJECT:

Architect – 1
Concrete – 1
Construction Manager – 1
Electrical – 1
Electronic Safety & Security – 1
Engineer – 2
Fire Detection & Alarm – 1
MEP Engineer – 1

PROJECT DOCUMENTS ON THIS PROJECT:

BLUEPRINTS
Package 1 – Volume 1 – 193 sheets
Package 2 – Volume 2 – 264 sheets
Package 2 – Volume 3 – 191 sheets
Package 2 – Volume 4 – 209 sheets
Package 2 – Volume 5 – 186 sheets
SPECIFICATIONS
313 Sections

ADDENDA
5 Reported


First Reported on 1/23/2019 1:06:12 PM – Last Updated 2/22/2019 11:12:37 AM

Project Information
VISITORS:
TOTAL VISITS:

PROJECT ID: 2019-08E9
BID DATE/TIME: 2/28/2019 – 02:00pm CST
EST. COST: $98,800,000
SQ FOOTAGE: 427000
PHASE: Active
STATUS: Addenda Received
PROJECT TYPE: New Construction
CATEGORY: Education
PUBLIC FUNDING: Yes

Related Images

Construction Preview
By |2019-02-25T13:22:07+00:00February 25th, 2019|Bid Bulletin|

About the Author:

Leave A Comment