web analytics

New Construction – Rosewood Community Center and Boys & Girls Club – Wichita Falls Housing Authority

Wichita Falls, TX (Wichita Co.) 

Work includes the construction of a new, approximately 20,457 SF one-story building (club approximately 12,500 SF, gymnasium approximately 7,500 SF). The buildings that occupied the one square block site were demolished and the site completely cleared except for the existing trees to be saved and protected during construction. Construction is concrete slab-on grade with spread footings, engineered steel structure except for the gymnasium which is designed as a pre-engineered metal building frame.

Exterior finishes include stone veneer, metal siding and “wood-look” horizontal aluminum siding, with a TPO roof on the club building and standing-seam metal roof on the gymnasium. Interior finishes include impact resistant gypsum board on metal studs, lay-in acoustical ceilings and ceiling clouds, polished concrete, luxury vinyl plank flooring and hard-rock maple gymnasium flooring. The building will include a complete fire sprinkler system, and packaged rooftop HVAC systems serving this non-combustible construction structure. Site landscaping, landscape irrigation, paving and lighting are included in the project.

Trades include concrete; masonry; metals; wood, plastics, and composites; thermal and moisture protection; openings; finishes; specialties; equipment; furnishings; fire; plumbing; mechanical; electrical; earthwork; exterior improvements.

 


CONSTRUCTION CATEGORIES BIDDING THIS PROJECT:

Architect – 1
MEP Engineer – 1

PROJECT DOCUMENTS ON THIS PROJECT:

BLUEPRINTS
Architectural – 24 sheets
Architectural Site – 1 sheets
Civil – 12 sheets
Electrical – 8 sheets
General – 1 sheets
Landscape – 2 sheets
Mechanical – 6 sheets
Plumbing – 9 sheets
Structural – 13 sheets

SPECIFICATIONS
19 Sections

ADDENDA
3 Reported

MEMOS
71 Reported


First Reported on Friday, February 3, 2023 – Last Updated 2/28/2023 8:45:06 AM

Project Information
PROJECT ID: 2023-0CC6
BID DATE/TIME: 3/2/2023
02:00pm CST
EST. COST: Not Available
SQ FOOTAGE: 20457
STATUS: Addenda Received
PROJECT TYPE: New Construction
CATEGORY: Parks / Recreation
PUBLIC FUNDING: Yes
NON-MEMBER? LEARN MORE MEMBERS CLICK HERE TO ACCESS NOW!
VBX first reported in the Virtual Plan Room on Friday, February 3, 2023.
Members with access to this service may monitor progress by tracking Project ID #2023-0CC6.
Construction Preview
By |2023-03-01T10:51:24-06:00March 2nd, 2023|Bid Bulletin|

About the Author: