web analytics

New Austin-Bergstrom International Airport (ABIA) Consolidated Maintenance Facility

Austin, TX (Travis Co.)

Work will consist of the new construction of the Austin-Bergstrom International Airport (ABIA) Consolidated Maintenance Facility on a site comprised of approximately 16 acres which will be located outside the secured area in a northeast section of the ABIA property. The facility will achieve LEED Silver certification as administered by the US Green Building Council (USGBC) and will provide maintenance support to the main airport daily operations. The site will be the center for numerous buildings that house various maintenance operations of the airport. These buildings include the following: Maintenance Headquarters, Motorpool, Warehouse, Trades, Recycling, Truckwash, Garages, several canopies, and the Airport Police.

The De-Icing equipment storage building will be located at a location close to the runway access road and connected to the main facility via a new road. The De-Icing facility will be secured with a perimeter fence and controlled access gates. Visitors, staff, and deliveries will arrive at all facilities from Gold Course Road, which intersects Hwy 171.

Project also includes covered parking, concrete and asphalt pavement, sidewalks, parking areas, signing and striping, curb and gutter, landscape areas, storm water structures and ponds, utilities, security fencing and gates.

VBX Congratulates the following Apparent Low Bidder:

Apparent Lows:

1 Low $59,200,000.00   JE Dunn Construction (512) 329-9618

 

Project Information
VISITORS:
TOTAL VISITS:

PROJECT ID: 2018-9418
BID DATE/TIME: 1/17/2019 – 03:00pm CST
EST. COST: $54,000,000
SQ FOOTAGE: 0
PHASE: Apparent Lows
STATUS: Apparent Lows Reported
PROJECT TYPE: New Construction
CATEGORY: Airports / Transportation / Rail
PUBLIC FUNDING: Yes

Related Images

Construction Preview
By |2019-01-26T16:47:38-05:00January 22nd, 2019|Bid Bulletin|

About the Author:

Leave A Comment