Presidio, TX (Presidio Co.) –
This project consists of 5,860 SF Expansion/Addition and 10,522 SF Renovation of the existing High School Gym for Presidio ISD. The work includes, but is not limited to: work performed during during facility occupancy; Demolition; Concrete including tilt-up concrete; steel joists, girders, decking; decorative metal; carpentry and casework; metal wall panels; thermoplastic membrane roofing; thermal & moisture protection; metal and wood doors & frames; Aluminum framed storefronts; gypsum board assemblies; wall, ceiling, and floor finishes; Specialties (display cases, signage, bathroom accessories); Fire protection specialties; stage curtains; plumbing; HVAC including split system air conditioners and propeller Unit heaters; electrical & interior/exterior lighting; fire alarm system; Fire Suppression system; Flexible Base Course; concrete curb ramps; Utilities. Alternate: Main Entry Addition.
CONSTRUCTION CATEGORIES BIDDING THIS PROJECT:
Architect – 1
Bidding General Contractor – 6
Civil Engineer – 1
MEP Engineer – 1 |
|
PROJECT DOCUMENTS ON THIS PROJECT:
BLUEPRINTS
Architectural – 29 sheets
Civil – 5 sheets
Electrical – 8 sheets
General – 8 sheets
Interiors – 3 sheets
Mechanical – 5 sheets
Plumbing – 6 sheets
Structural – 8 sheets
SPECIFICATIONS
19 Sections |
ADDENDA
2 Reported
MEMOS
1 Reported |
First Reported on Monday, December 28, 2020 – Last Updated 1/11/2021 12:05:17 PM |
|
|
Project Information |
PROJECT ID: |
2020-8ACB |
BID DATE/TIME: |
1/13/2021
04:00pm CST |
EST. COST: |
$1,500,000 |
SQ FOOTAGE: |
16382 |
STATUS: |
Addenda Received |
PROJECT TYPE: |
Additions / Renovations / Upgrade |
CATEGORY: |
Education |
PUBLIC FUNDING: |
Yes |
|
Leave A Comment