Scope of work consists of the complete construction work for the Eastside Water Treatment Plant laboratory renovation. It shall include, but not be limited to, complete renovation of existing laboratory facilities, build out of ground level below lab, renovation of adjacent men’s and women’s restrooms, handicap accessible control updates for elevator, sewer line relocation.

Work also includes additional flowable fill; additional 120V connection points; additional data outlets; additional acoustic ceiling tile; additional terrazzo floor finish; additional LED light fixture; additional 120V power wiring.

Trades involved are concrete; masonry; metalsl wood, plastics, and composites; thermal and moisture protection; openings; finishes; facility construction; equipment; furnishings; plumbing; heating, ventilating, and air conditioning (HVAC); electrical; electronic safety and security; earthwork; exterior improvements; utilities; process interconnections.

 


CONSTRUCTION CATEGORIES BIDDING THIS PROJECT:

Architect – 1
Bidding General Contractor – 1
Civil Engineer – 1
Electrical Engineer – 1

PROJECT DOCUMENTS ON THIS PROJECT:

BLUEPRINTS
Administration Building – 101 sheets
Details – 20 sheets
East Side Electrical – 33 sheets
General – 14 sheets
Instrumentation – 5 sheets

SPECIFICATIONS
23 Sections

ADDENDA
3 Reported

MEMOS
14 Reported


First Reported on Monday, March 6, 2023 – Last Updated 3/22/2023 9:21:36 AM

Project Information
PROJECT ID: 2023-1A2E
BID DATE/TIME: 3/24/2023
01:00pm CST
EST. COST: $3,000,000 – $3,500,000
SQ FOOTAGE: 0
STATUS: Bidders List / Update
PROJECT TYPE: Additions / Renovations / Upgrade
CATEGORY: Federal / State / Municipal
PUBLIC FUNDING: Yes
NON-MEMBER? LEARN MORE MEMBERS CLICK HERE TO ACCESS NOW!
VBX first reported in the Virtual Plan Room on Monday, March 6, 2023.
Members with access to this service may monitor progress by tracking Project ID #2023-1A2E.
Construction Preview
By |2023-03-23T12:15:26-05:00March 24th, 2023|Bid Bulletin|

About the Author: