This project consists of the Custer Road Pump Station Meter Vault Relocation for the Town of Prosper. Work to include, but is not limited to: The Project consists of furnishing all labor, equipment and materials (except as otherwise specified), and performing all work necessary for the construction of constructing a new meter vault with associated electrical, mechanical and piping, relocating the existing 16-inch sleeve valve, removal of the existing meter vault and piping along Custer Road and approximately 1,100 linear foot of 42-inch Barwrapped Concrete Cylinder pipe; concrete; unit masonry; metals; rough carpentry; thermal and moisture protection; openings; finishes; HVAC; electrical; earthwork; utilities; process integration; pollution and waste control equipment.

 


CONSTRUCTION CATEGORIES BIDDING THIS PROJECT:

Bidding General Contractor – 7
Earthwork – 1
Engineer – 1

PROJECT DOCUMENTS ON THIS PROJECT:

BLUEPRINTS
Architectural – 5 sheets
Civil – 9 sheets
Details – 11 sheets
Electrical – 13 sheets
General – 10 sheets
Mechanical – 3 sheets
Process and Instrumentation – 3 sheets
Structural – 11 sheets

SPECIFICATIONS
25 Sections

ADDENDA
1 Reported

MEMOS
0 Reported


First Reported on Wednesday, May 20, 2020 – Last Updated 6/3/2020 8:59:03 AM

Project Information
PROJECT ID: 2020-3DDB
BID DATE/TIME: 6/5/2020
02:00pm CST
EST. COST: $2,694,200
SQ FOOTAGE: 0
STATUS: Addenda Received
PROJECT TYPE: Additions / Renovations / Upgrade
CATEGORY: Wastewater Treatment
PUBLIC FUNDING: Yes
NON-MEMBER? LEARN MORE MEMBERS CLICK HERE TO ACCESS NOW!
VBX first reported in the Virtual Plan Room on Wednesday, May 20, 2020.
Members with access to this service may monitor progress by tracking Project ID #2020-3DDB.