Conroe Central Wastewater Treatment Plant

Conroe, TX (Montgomery Co.)

Work will consist of the construction of the Conroe Central Wastewater Treatment Plant (WWTP). Project will include but is not limited to site clearing, grubbing and compacted full; the in-fluent sanitary sewer; in-fluent lift station; in-fluent force main; head-works; secondary treatment/B-stage aeration basins, clarifiers, scum pump station, RAS/WAS pump station, and blower building and blowers and clarifiers; tertiary filters; UV disinfection, NPW system, effluent discharge and outfall; sludge thickening system; aerobic digesters; sludge dewatering; administration, maintenance, dewatering, blower and main switch-gear buildings; generators; and other work including odor control systems, chemical addition systems, SCADA system, site electrical distribution system, site utilities, paving drainage, fencing, and other miscellaneous buildings including MCCs.

PreBid Meeting on 6/19/2019 at 2:00 PM – , , – Mandatory Pre-Bid Meeting (Per Addendum 1) 06/19/2019 2:00 PM City Hall 1st Floor Council Chambers 300 W Davis Conroe, TX 77301.

Notes:

Addendum 1 changes the date for the mandatory pre-bid meeting.

Submit bids to the Owner, Attn: City Secretary 300 West Davis, 3rd Floor, Conroe, Texas 77301 or via the online bidding system

Direct questions through the online bidding system no later than July 1 at 2:00 PM, technical questions should be submitted through the online bidding system as well

Mandatory Pre-Bid attendees have been entered

Bid Security:
10% Bid Bond or Certified, Cashiers Check, 100% Performance & Payment Bonds


CONSTRUCTION CATEGORIES BIDDING THIS PROJECT:

Bidding General Contractor – 11
Civil Engineer – 1
Electrical – 5
Instrumentation & Control for Electrical Systems – 2
Instrumentation & Control for HVAC – 1
Integrated Automation Local Control Units – 1
Liquid Process Equipment – 1

PROJECT DOCUMENTS ON THIS PROJECT:

BLUEPRINTS
Architectural – 70 sheets
Bridge – 31 sheets
Civil – 57 sheets
Electrical – 57 sheets
General – 5 sheets
Instrumentation – 24 sheets
Mechanical – 12 sheets
Plumbing – 16 sheets
Process – 70 sheets
Structural – 59 sheets
Survey – 1 sheets
SPECIFICATIONS
232 SectionsADDENDA
6 Reported

First Reported on 6/3/2019 1:09:32 PM – Last Updated 7/16/2019 4:28:01 PM

Project Information
VISITORS:
TOTAL VISITS:

PROJECT ID: 2019-3E02
BID DATE/TIME: 7/18/2019 – 02:00pm CST
EST. COST: $56,700,000
SQ FOOTAGE: 0
PHASE: Active
STATUS: Addenda Received
PROJECT TYPE: New Construction
CATEGORY: Wastewater Treatment
PUBLIC FUNDING: Yes