San Antonio, TX (Bexar Co.) –
Scope of work consists of renovations to the Chance Academic Center on the SAC Campus, approximately 124,066 sq ft.
Bid package #1 includes but may not be limited to:
- Replacement of flooring, act ceilings, paint, new accessible casework in labs and repair of damaged interior finishes
- Comprehensive HVAC renovation including the replacement of main branches CHW/HW piping. AHU’s (roof deck reinforcement), exhaust fans, vav air terminal boxes, ductless mini-splits, and DDC controls.
- Replacement of fire alarms, one-to-one replacement of electrical water coolers, custodial/utility sinks, and electric water heater units of the same capacity.
- Update restrooms to be ADA compliant.
- Existing parking lot to be resurfaced to remove parking lines, remove parking signage, knockdown bollards provided and striping for fire lane maintained.
- New structural slabs at basement level mechanical rooms and new hinge slabs at entrances to fix heaving the building is experiencing.
- Mechanical ventilation of crawlspace and replacement of failed soil retainers.
- Addition of mud slab under only the basement level and replacement of sump pumps.
- Regrading of northwest corner and addition of an area drain to alleviate flooding issues.
- Regrading of sidewalks around building to be ADA compliant.
- Replacement of the roof (alternate) and all building sealants (alternate).
CONSTRUCTION CATEGORIES BIDDING THIS PROJECT:
Architect – 1
Civil Engineer – 1
Construction Manager – 1
Fire Detection & Alarm – 1 |
|
PROJECT DOCUMENTS ON THIS PROJECT:
BLUEPRINTS
Architectural – 41 sheets
Civil – 13 sheets
Electrical – 40 sheets
Fire Protection – 6 sheets
General – 4 sheets
Landscape – 2 sheets
Life Safety – 3 sheets
Mechanical – 40 sheets
Plumbing – 22 sheets
Structural – 9 sheets
Technology – 24 sheets
SPECIFICATIONS
2 Sections |
ADDENDA
7 Reported
MEMOS
1 Reported |
First Reported on Wednesday, February 21, 2024 – Last Updated 3/11/2024 8:46:46 AM
|
|
|
Project Information |
PROJECT ID: |
|
BID DATE/TIME: |
3/12/2024
03:00pm CST |
EST. COST: |
|
SQ FOOTAGE: |
|
STATUS: |
Addenda Received |
PROJECT TYPE: |
Additions / Renovations / Upgrade |
CATEGORY: |
Education |
PUBLIC FUNDING: |
Yes |
|