C.E. King High School to Middle School Conversion – Sheldon ISD

Houston, TX (Harris Co.)

This project consists of the C.E. King High School to Middle School Conversion, approximately 322,076 sf, for Sheldon ISD. Work to include, but is not limited to: Campus wayfinding, upgrade of security cameras and fire alarm system, new exterior canopy near the bus drop off, removal of all lockers in Building “A” corridors, converting two classrooms into a science lab (Bldg “B”) and the modification of all science labs with the removal of gas equipment/ lines in Bldgs “A”, “B” & “C”. Converting Bldg. “A” two classrooms into a Harris County Public Health Innovations (PHI) lab. Relocation/reconfiguration of the fine arts wing in Building “A” and band in the “F” Bldg. Reconfiguration of some offices/conference rooms in the administration area. Reconfiguration of a few cap (civil air patrol) classrooms in Building “B”. Replacement of interior light fixtures to led light fixtures in A, B & F buildings except for the gymnasiums & auditorium in Building A, unless area is reconfigured or marked otherwise, the ceiling tiles with ceiling grid to remain. Work consists of architectural and MEP systems; selective demolition; sidewalks; cast-in-place concrete; concrete unit masonry; decorative extruded metal; wood, plastics, and composites; thermal and moisture protection; openings; finishes; specialties; countertops; ornamental iron fence and gates; fire sprinkler systems; plumbing; HVAC; electrical; communications; electronic safety and security; Conversion of ISS to Choir Department in building; Conversion of Health Science to Art Room; Annex building will be modified to incorporate the sixth-grade building; A new bus drop off will be developed; Computer room to New Journalism space; Removal of all student lockers; Science labs will have gas shut off; Convert old choir to Instructional Theater-Deans area; Remove student lockers repair walls; Life Skills area; Security Screens at plaza near annex and competition gym; Interior and exterior building graphics.

 


CONSTRUCTION CATEGORIES BIDDING THIS PROJECT:

Architect – 1
Bidding General Contractor – 6
Civil Engineer – 1
Electrical – 1
Fire Detection & Alarm – 1
Fire Suppression – 1

PROJECT DOCUMENTS ON THIS PROJECT:

BLUEPRINTS
Architectural – 111 sheets
Civil – 3 sheets
Electrical – 94 sheets
General – 11 sheets
Mechanical – 18 sheets
Plumbing – 11 sheets

SPECIFICATIONS
20 Sections

ADDENDA
2 Reported

MEMOS
83 Reported


First Reported on Monday, March 2, 2020 – Last Updated 3/24/2020 12:50:15 PM

Project Information
PROJECT ID: 2020-1CDA
BID DATE/TIME: 3/26/2020
02:00pm CST
EST. COST: $4,000,000
SQ FOOTAGE: 322076
STATUS: Memo Received
PROJECT TYPE: Additions / Renovations / Upgrade
CATEGORY: Education
PUBLIC FUNDING: Yes
NON-MEMBER? LEARN MORE MEMBERS CLICK HERE TO ACCESS NOW!
VBX first reported in the Virtual Plan Room on Monday, March 2, 2020.
Members with access to this service may monitor progress by tracking Project ID #2020-1CDA.
Construction Preview
By |2020-03-25T09:48:33-05:00March 26th, 2020|Bid Bulletin|

About the Author:

Leave A Comment