Building 689 Renovations – Packages 1 – 5 – San Antonio State Supported Living Center – Texas Health and Human Services (Subbid)

San Antonio, TX (Bexar Co.) 

Project includes numerous upgrades for the San Antonio State Supported Living Center facility. Project will provide a more effective rehabilitation environment for the residents and a more enjoyable workspace for the staff.

As noted below, the project is sub-divided into five (5) primary packages. In addition, each package addresses specialized work elements. Therefore, sub-contractors are encouraged to bid as many packages for which they are proficient and experienced. Each package is stand-alone and contains focused specifications and drawings.

Package 1

Finishes at Bldg 689. This work includes removal and asbestos abatement of flooring throughout much of the building, moisture mitigation of the slab, installation of new flooring, painting at the gymnasium, resealing of exterior openings and surface cleaning of nearly the whole building, and painting of various exterior metal surfaces.

Package 2

Pool renovation at Bldg 689. This package includes the replacement of pool feed and drain lines, new surfacing of the pool and part of the deck, major replacement of pool filtration and water treatment systems, and various code-required upgrades. Included in this package are new pool overhead lighting and mechanical system upgrades.

Package 3

Thirteen (13) buildings on the SALC campus shall receive HVAC duct cleaning plus testing and balancing for air flow optimization.

Package 4

Five (5) SALC residence dorms shall each receive an additional exterior domestic water boiler tied into the existing system, plus all associated plumbing and electrical requirements. Also included is integrating the boiler controls package into the existing building management system.

Package 5

The work includes the sequential sectional removal of underground cast iron domestic water lines and the installation of new piping, valves, and fittings. Associated with this requirement will be patching of all asphalt and concrete flatwork damaged during the trenching for the new pipes, plus restoration of the landscape also damaged by the work.

 


CONSTRUCTION CATEGORIES BIDDING THIS PROJECT:

Architect – 1
Bidding General Contractor – 1
Civil Engineer – 1
Construction Manager – 1

PROJECT DOCUMENTS ON THIS PROJECT:

BLUEPRINTS
Bid Package 1 – 12 sheets
Bid Package 2 – 27 sheets
Bid Package 3 – 24 sheets
Bid Package 4 – 17 sheets
Bid Package 5 – 7 sheets

SPECIFICATIONS
23 Sections

ADDENDA
3 Reported

MEMOS
9 Reported


First Reported on Thursday, April 28, 2022 – Last Updated 5/24/2022 10:58:11 AM

Project Information
PROJECT ID: 2022-3294
BID DATE/TIME: 5/26/2022
02:00pm CST
EST. COST: Not Available
SQ FOOTAGE: 0
STATUS: Addenda Received
PROJECT TYPE: Additions / Renovations / Upgrade
CATEGORY: Healthcare
PUBLIC FUNDING: Yes
NON-MEMBER? LEARN MORE MEMBERS CLICK HERE TO ACCESS NOW!
VBX first reported in the Virtual Plan Room on Thursday, April 28, 2022.
Members with access to this service may monitor progress by tracking Project ID #2022-3294.
Construction Preview
By |2022-05-25T10:36:49-05:00May 26th, 2022|Bid Bulletin|

About the Author:

Leave A Comment