web analytics

Alice High School Multi-Purpose Facility – Alice ISD

Alice, TX (Jim Wells Co.)

Work will consist of the construction of a new 37,631 sf multi-purpose facility to be located at the high school campus with all associated exterior civil improvements. The construction includes, but is not limited to, the systems listed below: a. Drilled piers and a slab on grade foundation. b. Pre-engineered metal building.  c. The Training Center’s exterior envelope consisting of a single wythe of 8” split face CMU 12’-8” high, with insulated metal panels above the wainscot to the roof’s eave. A pre-finished standing seam metal roof and vinyl faced roof insulation.  d. The restrooms section exterior envelope consists of 4” split face CMU 12’-8” high, with insulated metal panels above the wainscot to the roof’s eave with an 8” back-up CMU wall. e. Interior painted CMU partitions, sealed concrete floors in Entry, Restrooms, Storage and ancillary spaces, gypsum board ceilings in restrooms and entry with all other spaces exposed to structure. The Training Center will contain an infilled synthetic turf with retractable batting cages and a retractable curtain. f. HVAC, electrical and plumbing systems.

 


CONSTRUCTION CATEGORIES BIDDING THIS PROJECT:

Architect – 1
Athletic & Recreational Surfacing – 1
Bidding General Contractor – 9
Civil Engineer – 1
Electronic Safety & Security – 1
MEP Engineer – 1
Metal Buildings/Special Structures – 1

PROJECT DOCUMENTS ON THIS PROJECT:

BLUEPRINTS
Architectural – 24 sheets
Architectural Demolition – 1 sheets
Civil – 14 sheets
Electrical – 10 sheets
Front End – 7 sheets
Mechanical – 4 sheets
Plumbing – 5 sheets
Structural – 13 sheets

SPECIFICATIONS
22 Sections

ADDENDA
4 Reported

MEMOS
5 Reported


First Reported on Friday, March 20, 2020 – Last Updated 4/8/2020 8:37:34 AM

Project Information
PROJECT ID: 2020-2688
BID DATE/TIME: 4/9/2020
02:00pm CST
EST. COST: $3,500,000
SQ FOOTAGE: 37631
STATUS: Addenda Received
PROJECT TYPE: New Construction
CATEGORY: Education
PUBLIC FUNDING: Yes
NON-MEMBER? LEARN MORE MEMBERS CLICK HERE TO ACCESS NOW!
VBX first reported in the Virtual Plan Room on Friday, March 20, 2020.
Members with access to this service may monitor progress by tracking Project ID #2020-2688.
Construction Preview
By |2020-04-08T09:33:54-05:00April 9th, 2020|Bid Bulletin|

About the Author:

Leave A Comment