web analytics

VBXStaff

About VBX Staff

This author has not yet filled in any details.
So far VBX Staff has created 19 blog entries.

Head Start Facility – Holliday ISD

By |2018-05-02T12:56:56+00:00May 2nd, 2018|Bid Bulletin|

Head Start Facility - Holliday ISD Crowell, TX (Foard Co.) – Work consists of the construction of an Early Head Start/Head Start Facility at site of the existing High School Campus; new concrete sidewalks, steel canopies; relocation and new site u

JCPenney Store No. 0611 Interior Renovation – Escalator at South Plains Mall

By |2018-05-02T13:44:39+00:00March 15th, 2018|Bid Bulletin|

Work will consist of the new construction of a 10,790 sf tilt wall shell building structure along with related site improvements located at 4405 Williams Drive in Georgetown, Texas. Project also includes mortar and masonry; metals; wood and plastics; thermal and moisture protection; doors and windows; painting; security access; mechanical; electrical; and plumbing.

Project Bravo Parking Garage

By |2018-05-02T13:44:22+00:00March 15th, 2018|Bid Bulletin|

Work will consist of the construction of a six level, 1,200 parking space, cast in place concrete, 417,709 sf parking garage (6,143 sf is retail space).  Trades include all scopes with the exception of cast in place concrete, landscaping, earthwork and utilities.  The McCullough office complex includes 2 high-rise 27 towers with an interconnecting podium building between

Highland Park Multi-Use Building (Subbid)

By |2018-05-02T13:43:56+00:00March 15th, 2018|Bid Bulletin|

Work consists of construction of a new 2 story pool, locker room, office and conference space building, approximately 49,255 total sf. Work includes, but not limited to civil, landscape, structural, architectural, mechanical, electrical, plumbing, pool and kitchen requirements.

Travis Middle School (Travis Science Academy) & Cater Elementary School Renovations – Temple ISD (Subbid)

By |2018-05-02T13:43:41+00:00March 15th, 2018|Bid Bulletin|

Work will consist of the 28,700 sf renovation to the Travis Middle School (Travis Science Academy – 1551 W 25th St, Temple, TX 76504) and the 11,500 sf renovation for Cater Elementary School (4111 Lark Trail, Temple, TX 76502) for Temple ISD. Project also includes selective demolition; concrete; masonry; metals; wood, plastics, and

Load More Posts